b&w photograph
Fair condition
Priests and altar servers engage in a religious service, probably Holy Sacrifice of the Mass in the original chapel (built in 1953). This upper floor space was renovated into the McNally Theatre Auditorium which opened on March 1 1982, with the stage moved to the east wall and the auditorium seating in the west wall (adjoining McNally Building). In 1989 the chapel's double-height basement gymnasium was converted into two levels housing the Faculty Lounge, IT office, The Den computer lab, and classrooms while still retaining the external facade of the original 1953 church. Some details credited to alumnus Ervin J. Doak (Commerce class of 1962).
Written on back: '643 34'.